New eolic off-shore marine parc

STETTINO PORT, POLONIA – December 2017 NEW EOLIC OFF-SHORE MARINE PARC Construction and installation of the foundations for 100 off-shore wind turbines. Numerous 250ton CGR cylinders positioned in big metallic structures have constituted the vises for the blocking and the positioning of the support for the wind turbines.

Ferrari world Abu Dhabi

Bars substitution In the heart of the Ferrari World in Abu Dhabi, in an enormous cristal bottleneck there was the request to make a hole for the passage of a thrilling roller coaster.The bottleneck at its beginnig has a diameter of a 100 metres and it ends with a diameter of 18 metres with a total height of 36 metres.The cristal bottleneck is held up by a netted structure called the Mero Structure©. This structure is composed by spherical knots and tubular beams screwed in the knots. Bars substitution procedure As it was not possible to remove the bars while tensioned or pressured, to make this hole and to reinforce it a special hydraulic equipment was the perfect solution. The goal of the equipment was to support the structure by blocking the spherical knots and at the same time to avoid the bars to be stressed which allowed their removal. Releasing equipment The releasing equipment is composed by 2 tubes which go into one another and at their extremities they are equipped with the system which blocks the spherical knots. The system, composed of an hydraulic cylinder operated by a pump, separates the 2 extremities safely.

Calibration machine for aluminium tubes

Germany, June 2015 Double acting cylinders for calibration machine with sequential jaws for aluminium tubes. The machine is useful for crimping and expanding aluminium tubes during clamping. At the beginning all tubes will be crimped to obtain an initial dimension for the following expansion. The 12 sequential jaws are arranged in a circle. Each jaw is powered by a high pressure double-acting hydraulic cylinder. The pressure is generated by a high pressure hydraulic unit with manometer. The operator can verify the operations by using a wire connected remote control.